Tanca

menu-img-alt vale-wave
Imagem de header interno Imagem de header interno
com.liferay.portal.kernel.util.DateUtil_IW@1f99c2e2
Photo: Vale's Archive
com.liferay.portal.kernel.util.DateUtil_IW@1f99c2e2
Photo: Vale's Archive
Tailings management is an essential activity for supporting the searches carried out by the Military Fire Brigade of Minas Gerais and for the environmental recovery of the areas impacted by the collapse of dam B1, in Brumadinho.

In the panels below, it is possible to follow the main indicators of this work through the stages of removal, movement and destination.

The panels also include the indicators of the work developed by the Fire Department

General Management Mapping
It shows the removal and handling volumes with the indication of the origin and destination points of each front.
Pit disposal
Displays the volume deposited in the pit and disposal site.
Volume control at DRTs (Temporary Tailings Deposits)
Displays the volume of tailings in each DRT and in the pit.
Screening
Displays the volume of material that is in each sieving front, both what enters and leaves the sieves.
Routes 
Displays the routes taken by the trucks within the hot zone.
Loading and unloading zones
It shows the loading and unloading points of the trucks.
CBMMG Productivity
It presents the indicators of the search process: investigated volume, average productivity, amount of equipment, amount of excavators, and amount of military personnel.

Reparation Day by Day

Repair every day and build the future together. Access our accounts and find out more.

Click here